Linepack

Transportation Notes

Citing high temperatures in the 90s forecasted for Florida and low linepack, Florida Gas Transmission told market-area customers it was issuing an Overage Alert Day Friday at 10% tolerance for negative daily imbalances.

September 27, 2010

Transportation Notes

After projecting earlier that linepack on its California Gas Transmission system might exceed maximum target levels going into the weekend, Pacific Gas and Electric (PG&E) issued a systemwide Stage 2 high-inventory OFO for Saturday. Penalties of $1/Dth were set for exceeding a relatively lenient (at least for PG&E) tolerance of 20% on positive daily imbalances.

June 28, 2010

Transportation Notes

Pacific Gas and Electric did not extend a systemwide Stage 2 high-inventory OFO beyond Wednesday, but it projected that linepack on its California Gas Transmission system would be rising above maximum target levels Friday and Saturday.

June 18, 2010

Transportation Notes

Southern California Gas declared a high-linepack OFO for Saturday, with Buy-Back penalties applying to deliveries exceeding 10% of nominated quantities.

June 14, 2010

Transportation Notes

After ending a high-linepack OFO Friday, Southern California Gas issued another one for Saturday, retaining the same 10% tolerance for positive daily imbalances.

June 1, 2010

Transportation Notes

Southern California Gas and Pacific Gas and Electric are lifting Friday high-linepack OFOs that had been in effect for Thursday only.

May 28, 2010

Transportation Notes

After allowing a previous high-linepack OFO to expire Monday, Southern California Gas (SoCalGas) declared a new one for Wednesday, setting a positive daily imbalance tolerance of 10%. However, the e-mailed OFO notice did not get sent until shortly after 7:30 a.m. CDT Wednesday morning. Spokeswoman Denise King confirmed that despite the late announcement, Wednesday was the effective date of the OFO. SoCalGas also said Wednesday it had completed the final tie-in of field Line 159 at its Goleta storage facility; the work previously had been expected to last through Friday. The early finish allowed the utility to restore 140 MMcf/d of withdrawal capacity and 60 MMcf/d of injection capacity at Goleta.

April 29, 2010

Transportation Notes

Southern California Gas kept a high-linepack OFO that had been implemented Saturday in effect through Sunday before ending it Monday.

April 27, 2010

Transportation Notes

Southern California Gas kept a high-linepack OFO that had been implemented Saturday in effect through Sunday before ending it Monday.

April 27, 2010

Transportation Notes

Southern California Gas declared a high-linepack OFO for Saturday, setting the tolerance for positive daily imbalances at 10%.

April 26, 2010
1 4 5 6 7 8 33