Both Florida Gas Transmission and Pacific Gas & Electricextended low-linepack OFOs (see Daily GPI, Oct. 5)-FGT through Tuesday and PG&Ethrough today. Neither changed the OFO conditions. PG&E posts OFOsa day in advance, while FGT usually re-evaluates system conditionseach morning before deciding whether to declare one for that gas day.

Due to road crossing work in Kentucky, Tennessee will take Line#3 out of service between Mainline Valves 112-3 and 112-3A Oct.19-20. Nominations will not be accepted at the Kentucky/Ohio-Naplessales meter during that period.

Transwestern will begin installing a filter separator Nov. 10 onthe PG&E Topock Line at the California border. No PG&ETopock flows will be scheduled until the line returns to service,which is estimated as Nov. 13.

©Copyright 1999 Intelligence Press Inc. All rights reserved. Thepreceding news report may not be republished or redistributed, inwhole or in part, in any form, without prior written consent ofIntelligence Press, Inc.