Station

Transportation Notes

Northwest issued a Declared Stage II Entitlement for deliverypoints north of the Kemmerer (WY) Compressor Station, effectiveSaturday until further notice. The purpose was to prevent customerdrafting of the system and to preserve Northwest’s Jackson Prairiestorage inventory, the pipeline said. A Receiving Party is subjectto penalties for delivery point takes of more than 8% above itsconfirmed nominations.

October 30, 2000

Transportation Notes

Florida Gas Transmission discovered a leak on its 22-inchmainline downstream of Station 4 (Matagorda County, TX) betweenvalves 4-7 and 4-5 (west of Galveston Bay). That section was beingisolated and its pressure reduced. As of Tuesday afternoon,estimated downtime was 24-36 hours. FGT was keeping shippers wholeTuesday and trying to re-route as much affected gas as possible, aspokeswoman said, but for today’s gas day there will be no flow at15 receipt points and two delivery points.

October 4, 2000

Transportation Notes

The #1 compressor at Roswell (NM) Station became unavailableFriday due to a bearing failure, causing a 30 MMcf/d reduction inSan Juan Crossover capacity, El Paso said. Repairs were expected tohave been completed Saturday.

September 11, 2000

El Paso Explosion Takes 500 MMcf/d Off Market

About 1 Bcf/d of flow on El Paso’s South Mainline downstream ofPecos River (NM) Station ceased after the pipeline exploded earlySaturday, killing 10 people and seriously injuring two others at anearby campsite (see related reports:wrap-up, politics).

August 22, 2000

Transportation Note

El Paso’s delivery meter to Transwestern at the Window RockStation (Apache County, AZ) will be shut in July 24-25 forequipment upgrade

July 17, 2000

Transportation Notes

El Paso postponed to an indefinite date Guadalupe Stationmaintenance that had been set for today and Wednesday. Wenden Aturbine work began Sunday, one day earlier than previouslyannounced, and will run through Friday, reducing Havasu Crossovercapacity by 100 MMcf/d, the pipeline said.

June 27, 2000

Transportation Notes

Florida Gas Transmission said Thursday that unplanned compressormaintenance at Station 7.5 in Port Barre, LA, which it had expected toend last Monday (see Daily GPI, May 2),is continuing until further notice. The work limits upstream volumesto 875 MMcf/d. An Overage Alert Day notice for FGT’s market area (seeDaily GPI, May 10) remained in effectThursday.

May 12, 2000

Transportation Notes

Due to high linepack, Southern California Gas issued anOvernominations Day notice for Saturday.

May 1, 2000

Transportation Notes

Due to nomination increases exceeding available capacity reducedby a lost engine at Station 315, Tennessee bumped flowingInterruptible services (IT-X, IT, AOT, PAT, Payback, EDS/ERS) andrestricted nominated services through Secondary (IT-X, IT, AOT,PAT, Payback, EDS/ERS, Secondary) for meters downstream of MLV 314on the 300 line effective 1700 for yesterday’s gas day.

April 19, 2000

Transportation Notes

Texas Eastern plans minor maintenance for a few hours Thursdaymorning at the Grand Chenier (LA) Station. Operators may experiencehigher than normal pressures on the West Louisiana zone’s CameronSystem, but pressures are expected to return to normal by evening.

April 12, 2000