Situation

IPAA Chief Calls Domestic E&P Situation ‘Disturbing’

Despite the high commodity prices enjoyed by both natural gas and crude oil producers, John B. Walker, chairman of the Independent Petroleum Association of America (IPAA), said that observers of the E&P sector shouldn’t conclude that all that glitters is gold.

March 4, 2004

Futures Test Support as Traders Assess the Storage Situation

Adding to losses etched in Thursday’s abbreviated session, the natural gas futures market continued lower Friday as buyers appeared content to wait for sub-$5.00 prices before re-entering the market.

February 23, 2004

Transportation Notes

Citing maximum withdrawals at its Washington Ranch storage facility, El Paso declared an Unauthorized Overpull Penalty situation Tuesday. The pipeline also said the Flagstaff (AZ) Station’s #1 unit requires extensive repairs that will make the station unavailable through April 9. The work reduced capacity of the North Mainline by about 90 MMcf/d effective with Tuesday’s Cycle 2 nominations.

February 4, 2004

Transportation Notes

Saying its Washington Ranch storage facility was experiencing maximum withdrawals, El Paso declared an Unauthorized Overpull Penalty situation Tuesday. The pipeline said it would limit scheduled volumes at underperforming interconnects to insure system integrity.

January 28, 2004

Transportation Notes

El Paso declared an Unauthorized Overpull Penalty situation Sunday, saying its Washington Ranch storage facility was at maximum withdrawal.

December 30, 2003

Transportation Notes

El Paso declared an Unauthorized Overpull Penalty situation Tuesday, saying its Washington Ranch storage facility was experiencing maximum withdrawals. To insure system integrity, the pipeline planned to limit scheduled volumes at underperforming interconnects.

October 22, 2003

Transportation Notes

El Paso declared an Unauthorized Overpull Penalty situation late Monday afternoon, saying its Washington Ranch storage facility was experiencing maximum withdrawals. “To insure system integrity, El Paso will place limits on scheduled volumes at interconnects that are underperforming,” the pipeline added. El Paso also said it has not determined how long the Alamo Lake Station’s #2 turbine will be down for unscheduled repairs. The outage reduced capacity of the Havasu Crossover 145 MMcf/d effective with nominations for Cycle 4 Monday and Cycle 2 Tuesday until further notice.

October 1, 2003

Transportation Notes

El Paso said an Unauthorized Overpull Penalty situation declared Tuesday due to low linepack was being continued Wednesday until further notice. The Washington Ranch storage facility is experiencing maximum withdrawals, the pipeline said.

June 19, 2003

Transportation Notes

El Paso declared an Unauthorized Overpull Penalty situation late Tuesday afternoon, citing “low linepack, the unavailability of withdrawal capability at Washington Ranch storage facility and continued forecasted warm weather in our operating area.”

May 22, 2003

Williams Warns of Strategic Risks, Difficult Financial Situation

The Williams Cos. warned Tuesday in its annual report with the Securities and Exchange Commission (SEC) that limited access to capital due to its non-investment-grade credit status and insufficient cash flow from operations to pay debt obligations make it imperative that the company sell its previously announced $2.25 billion in additional assets this year.

March 21, 2003
1 4 5 6 7 8 11