Saturday

Transportation Notes

Although Thursday it was projecting above-target linepack for the gas days of Friday and Saturday, Pacific Gas & Electric did not extend a high-inventory OFO beyond Thursday.

June 6, 2003

Transportation Notes

Pacific Gas & Electric did not extend a two-day high-inventory OFO beyond Saturday.

June 3, 2003

Transportation Notes

Effective with Saturday’s gas day, Northwest will be cutting alternate nominations north through its Green River Compressor Station in the Timely Cycle and all subsequent cycles as needed until further notice. The pipeline said Thursday it will begin moving balancing gas north from its Clay Basin storage account to the Jackson Prairie Storage Facility until adequate levels have been established in its Jackson Prairie account. “[E]xtremely low levels in Northwest’s Jackson Prairie account require this action,” according to a bulletin board posting.

May 16, 2003

Transportation Notes

Pacific Gas & Electric extended Saturday’s Stage 2 high-inventory OFO through Sunday, tightening the imbalance tolerance from 7% to 2%, but then lifted it Monday.

December 31, 2002

Transportation Notes

Florida Gas Transmission lifted a lengthy Overage Alert Day notice Friday, while Northern Natural Gas lifted for Saturday a System Overrun Limitation that had been in effect for two days.

November 4, 2002

Transportation Notes

Although as of Thursday morning it was still projecting linepack volumes above its maximum target level for Friday and Saturday, Pacific Gas & Electric did not extend a high-inventory OFO beyond Thursday.

October 18, 2002

Transportation Notes

Pacific Gas & Electric did not extend a Stage 2 high-inventory OFO beyond Saturday.

October 15, 2002

Transportation Notes

Pacific Gas & Electric did not extend a high-inventory OFO beyond Saturday.

October 1, 2002

Transportation Notes

Pacific Gas & Electric issued a systemwide Stage 2 high-inventory OFO for Saturday, one day after it had lifted a similar OFO that had been in effect Wednesday and Thursday. However, this time the OFO carried a much more stringent imbalance tolerance of zero, but penalties remained the same at $1/Dth.

September 23, 2002

Transportation Notes

Pacific Gas & Electric did not extend a high-inventory OFO beyond Saturday.

September 4, 2002