Citing a mainline capacity constraint south of Glendale, AR, MRT issued a System Protection Warning (SPW) Saturday. See the bulletin board for SPW conditions.

Florida Gas Transmission extended an Overage Alert Day into its fifth day Friday and loosened the tolerance for negative daily imbalances from 15% to 20%.

Rockies Express will perform maintenance at its Echo Springs Compressor Station Monday through Friday, during which nominations will not be scheduled at the Wamsutter Echo Springs point.

Southern California Gas will lose 135 MMcf/d of injection capacity at its Goleta storage facility Tuesday while new LOCW (lube oil cooling water) pumps are installed.

Questar reported being notified of a regional refining constraint by its third-party processor that “adversely impacted Questar’s ability to dispose of liquids accumulated at its Greasewood station.” As a result, Questar said it was reducing the CHDP (cricondentherm hydrocarbon dew point) Operating Limit for Zone 6 from 80 degrees F to 60 degrees effective Saturday (Aug. 9). This limitation is expected to continue until the refining constraint is released, Questar said.

©Copyright 2008Intelligence Press Inc. All rights reserved. The preceding news reportmay not be republished or redistributed, in whole or in part, in anyform, without prior written consent of Intelligence Press, Inc.