El Paso warned Saturday of potential high-linepack conditions on its system and said its Washington Ranch storage facility was at maximum injections. If the situation failed to improve, El Paso said, declaration of a Pack Strained Operating Condition (SOC) would be required. However, it canceled the SOC warning Monday, citing improved conditions.

Transco said it is considering requests until 9 a.m. CDT Sept. 11 for firm backhaul transportation service of up to 200,000 Dth/d with a primary path from Station 210 in Zone 6 to Station 65 in Zone 3. The period of the service would be from Oct. 1 through April 30, 2008. See the bulletin board for details, or call Laurie Catlett at (713) 214-4356 or Suzie Heiser at (713) 214-4626 for more information.

©Copyright 2007Intelligence Press Inc. All rights reserved. The preceding news reportmay not be republished or redistributed, in whole or in part, in anyform, without prior written consent of Intelligence Press, Inc.