Florida Gas Transmission extended an Overage Alert Day noticeinto its third day Wednesday, continuing to cite high market-areademand. However, Pacific Gas & Electric is lifting itslow-linepack OFO today.

El Paso said it must take the Waha GE turbine off-line foremergency maintenance today. The IMLWAHA interconnect will belimited to 60 MMcf/d into El Paso, and five other Waha-area pointswill be limited to a total of 520 MMcf/d in receipts from El Paso.Puckett and Terrell gas must be routed through Keystone, which maycause increased allocations at Pecos River Station.

Oct. 19-20 work on the suction of Texas Eastern’s Lebanon (OH)Station will prevent gas on the 24-inch system from flowing throughthe station. Based on recently scheduled volumes between theLongview (TX) and Batesville (OH) stations, aggregate receiptswould be cut by about 70,000 Dth/d, or 35%. However, the pipelinesaid, cuts at individual meters may vary from that percentage basedon service priorities, supply rankings by TABS-1 pools andnominated pool balances at the time of the restriction.

©Copyright 1999 Intelligence Press Inc. All rights reserved. Thepreceding news report may not be republished or redistributed, inwhole or in part, in any form, without prior written consent ofIntelligence Press, Inc.