PG&E Gas Transmission-Northwest reported completing hydrotesting of its A-Line ahead of schedule. The project’s end restoredcapacity to best-efforts levels of 2,620 MMcf/d at Kingsgate and1,930 MMcf/d at Station 14 Friday.
Restored
Articles from Restored
Transportation Notes
NOVA restored its 16-inch Josephine Lateral in northwest Albertato service Saturday evening following a rupture caused bythird-party construction. The outage was isolated to a 7-kilometersection of the NPS 16 Josephine Lateral Loop about 30 kilometersnorth of Saddle Hills Compressor Station, NOVA said. The pipelinechanged its daily system imbalance tolerance to -2/+18% due to lowlinepack Saturday morning.
Wisconsin PSC Awaiting Two Commissioners
The currently one-member Wisconsin Public Service Commission issoon to be restored to full three-commissioner status. Thecommission has been down to one member, Joe Mettner, since May 15when Chair Cheryl L. Parrino stepped down. Previously, Dan Eastmanleft his commission post April 30.
Transportation Note
NGPL restored full nominations Friday at six wells on the NorthCuster gathering line in Custer County, OK. The wells had been cutto 1 MMbtu/d Tuesday after a line leak was discovered.