Meikle

Transportation Notes

Because of a suspected failure on TransCanada’s NPS 20 Peace River Mainline on the Alberta system upstream of the Meikle River Compressor Station, FT and IT Service in Segment 1 UPRM will be cut until further notice. Typical flow for the area is 5,500 E3m3/d or about 200 MMcf/d. The line has been isolated and field personnel are trying to visually confirm the suspected failure location in the remote marshy area of northwestern Alberta. Contact the pipeline at (403) 920-7473 for details.

October 9, 2002