Grandview

Transportation Notes

Due to “an issue” upstream of Little Red River Compressor Station with the in-line inspection tool it was running on the Fayetteville Lateral between the Grandview and Bald Knob stations, TGT will take volumes at 14 receipt points upstream of Little Red River to zero at the start of Thursday’s gas day. It declared a force majeure for those points. However, TGT said it expected the required maintenance to be completed by the start of Friday’s gas day.

July 16, 2009

Transportation Notes

After allowing a one-day systemwide Stage 2 low-inventory OFO to lapse Friday, Pacific Gas & Electric issued a systemwide Stage 2 high-inventory OFO on its California Gas Transmission system for Saturday. A tolerance of 9% was set for positive daily imbalances, with noncompliance penalties of $1/Dth.

February 23, 2009