Adding to the reinstated interconnect points on its system, Sabine Pipe Line LLC reported that its force majeure for Meter 1552 — NGPL/Henry Hub (NGPL to Sabine) — was lifted on Wednesday and the company is accepting nominations at that location.

Sabine urged shippers to double check the operational status of production facilities, downstream entities, and interconnecting pipelines prior to tendering nominations. The NGPL meter joins two Gulf South meters (receipts and deliveries) and one delivery point meter at Columbia Gulf (see Daily GPI, Oct. 5).

On Wednesday afternoon, Sabine also reported that the force majeure will be lifted for additional interconnects on Thursday. They include the following meters:

Nominations for receipts from Columbia Gulf and deliveries to NGPL also may be confirmed and scheduled to the extent that the volumes are available for displacement, Sabine said.

The force majeure remains in place for other points at the hub, including Southern Natural, Texas Gas, Bridgeline and Sea Robin, until further notice. Due to the unavailability of compression at the hub complex, nominations for receipts and deliveries will be accepted only to the extent that gas can be received and delivered without additional compression, Sabine said.

©Copyright 2005Intelligence Press Inc. All rights reserved. The preceding news reportmay not be republished or redistributed, in whole or in part, in anyform, without prior written consent of Intelligence Press, Inc.