Tennessee is reinstating service constraints downstream ofStation 325 (Libertyville, NJ) in Zones 5 and 6 (see Daily GPI,Dec. 21) effective today.

Sonat is extending an OFO Type 3 applied Tuesday to four groups(see Daily GPI, Dec. 21) to three additional groups today: East ofWrens, Brunswick Line and Savannah Line.

Northern Natural Gas extended a System Overrun Limitation forall market-area zones (see Daily GPI, Dec. 21) at least throughtoday.

Due to unplanned maintenance at Compressor Station 115, NGPL’sSouth Joliet #2 interconnect with ANR (Will County, IL) in theMarket Delivery Zone is limited to 100,000 MMbtu/d until furthernotice. Based on current nominations, NGPL anticipates that noIT/AOR and a limited amount of pro-rated secondary FT areavailable.

Texas Eastern is not accepting nominations for due-shippermakeup gas at least through Monday.

El Paso has several maintenance projects scheduled duringJanuary, most of which will have minor impacts. The two that willcause relatively major constraints are: Jan. 18-19, a FlagstaffStation outage will reduce North Mainline capacity by 100 MMcf/d;and Jan. 25-26, Cornudas “A” Plant will be down, cutting SouthMainline capacity by 200 MMcf/d.

A gas quality problem at NGPL’s interconnect with CIG in WheelerCounty, TX (see Daily GPI, Dec. 14) was resolved and NGPL hasresumed accepting nominations there.

©Copyright 1999 Intelligence Press Inc. All rights reserved. Thepreceding news report may not be republished or redistributed, inwhole or in part, in any form, without prior written consent ofIntelligence Press, Inc.