NGI The Weekly Gas Market Report
NGI Archives | NGI All News Access
Tuscarora Lateral Approved by FERC
FERC has approved a proposal by Tuscarora Gas Transmission toincrease its mainline capacity and construct a new lateral toprovide up to 10,000 Dth/d of FT for Sierra Pacific Power.
The increased capacity on the 229-mile mainline line from aninterconnect with PG&E Gas Transmission Northwest at Malin, ORto a meter station near the Tracy Power plant in Storey County, NV,will serve a growing load on the Sierra Pacific system.
Over the last three years SPPC has experienced an annual averageincrease of 4.6% in its customer base. The 15-year contract callsfor rolled in pricing. Cost of the project is estimated at $10.2million.
©Copyright 2000 Intelligence Press, Inc. All rightsreserved. The preceding news report may not be republished orredistributed in whole or in part without prior written consent ofIntelligence Press, Inc.
© 2024 Natural Gas Intelligence. All rights reserved.
ISSN © 2577-9877 | ISSN © 1532-1266 |