Florida Gas Transmission issued an Overage Alert Day notice Thursday with 25% tolerance for negative daily imbalances. The pipeline’s previous OAD ended last Saturday.

El Paso said a check valve replacement on the Gallup (NM) Station’s C turbine that was scheduled for next Tuesday was postponed to Aug. 24; thus the anticipated 325 MMcf/d reduction of San Juan Basin capacity on Tuesday will not occur.

ANR has informed Tennessee that due to a mandatory inspection, ANR will not be able to accept any flows through the Grand Chenier (LA) Compressor Station on its system from Aug. 9 through Aug. 13. Customers wanting to divert their gas to Tennessee utilizing HIOS meter 012559 during this outage must obtain a processing agreement at the Grand Chenier plant prior to Aug. 9. Call BP‘s Merle Garrelts at (281) 366-0928 for processing agreement information.

©Copyright 2004 Intelligence Press Inc. All rights reserved. The preceding news report may not be republished or redistributed, in whole or in part, in any form, without prior written consent of Intelligence Press, Inc.