As of Friday Sea Robin expected to restore flow Saturday (Feb.21) on its 16-inch West Cameron 580 lateral, pending favorableweather conditions. The force majeure implemented Jan. 27 whenrepairs on a leak began (see Daily GPI, Jan. 29) was to be releasedwhen the lateral was declared in service, Sea Robin said.

Saying linepack had been stabilized, El Paso lifted anUnauthorized Overpull Penalty alert Friday.

PG&E Gas Transmission-Northwest expected Kingsgate capacityto return to normal Saturday (Feb. 21) after limiting receiptsthere to 2520 MMcf/d Friday due to the need to inspect a thrustbearing at Station 4 (Sandpoint, ID).

A day after lifting its only remaining service restriction (seeDaily GPI, Feb. 19), Tennessee reinstated a seal through about 16%of Secondary services on its South Pass System Thursday due toexcess nominations.

Columbia Gas said Thursday there would be no deadline for “latenominations.” It said it would try to confirm all nominationssubmitted after the normal 11:30 CST daily deadline; however, ininstances when the gas can’t be confirmed with an upstream ordownstream pipeline, an intraday nomination may be necessary.

©Copyright 1998 Intelligence Press. All rights reserved. Thepreceding news report may not be republished or redistributed, inwhole or in part, in any form, without prior written consent ofIntelligence Press, Inc.