Pre-File

Tellurian Pre-Files for 2.3 Bcf/d Permian-to-Louisiana Pipe

Tellurian Pre-Files for 2.3 Bcf/d Permian-to-Louisiana Pipe

Permian Global Access Pipeline LLC (PGAP), a 625-mile, 42-inch diameter pipeline project designed to feed supply to Tellurian Inc.’s proposed Driftwood liquefied natural gas (LNG) terminal in Louisiana, has asked to open the pre-filing process at FERC.

August 22, 2019