Permian Global Access Pipeline LLC (PGAP), a 625-mile, 42-inch diameter pipeline project designed to feed supply to Tellurian Inc.’s proposed Driftwood liquefied natural gas (LNG) terminal in Louisiana, has asked to open the pre-filing process at FERC.
Pre-File
Articles from Pre-File