Disassembled

Transportation Notes

El Paso reported that in conjunction with the White Rock Station controls replacement project, the White Rock 1 turbine compressor was disassembled “and it has been determined that repairs can not be completed within the original time frame.” Following completion of the station’s controls replacement, due April 27, White Rock 1 will remain down through May 3, reducing El Paso’s San Juan Basin capacity by 105 MMcf/d.

April 22, 2003