A pigging operation on Matagorda Offshore Pipeline System from Wednesday evening through Friday resulted in very high liquid levels, and thus scheduled volumes from MOPS were reduced to zero for the gas days of Friday through Sunday. The action cut deliveries of about 100,000 MMBtu/d into South Texas interconnects with Florida Gas Transmission, Gulf South and Tejas Gas Pipeline, MOPS operator Northern Natural Gas said.

©Copyright 2002 Intelligence Press Inc. All rights reserved. The preceding news report may not be republished or redistributed, in whole or in part, in any form, without prior written consent of Intelligence Press, Inc.