Daily GPI / NGI All News Access

Transportation Notes

Transportation Notes

NGPL reported experiencing an unexpected pipeline outage Saturday south of Station 304 on the Gulf Coast Mainline. Until further notice NGPL is unable to flow volumes from six receipt points in Panola County, TX.

Total receipts are being restricted by about 30% this week between Atlanta, TX, and Lebanon, OH, as Texas Eastern conducts in-line inspections of its 24-inch system. A similar constraint is expected in August. Pipe replacement between the East Texas points of Joaquin and Longview, originally posted as two separate one-day outages, has been combined into a single July 20-21 outage affecting 17 meters. Texas Eastern expects that gas flows will be resumed sometime during the July 21 gas day.

©Copyright 1999 Intelligence Press Inc. All rights reserved. The preceding news report may not be republished or redistributed, in whole or in part, in any form, without prior written consent of Intelligence Press, Inc.

Comments powered by Disqus