In the article titled Great Lakes Storage Under Scrutiny; NatGas Cash, Futures Weak (see Daily GPI, Sept. 9), NGI incorrectly stated that the ANR Pipeline interconnect with REX at Shelby, IN, got a large increase in operating capacity Wednesday, going from 608,605 MMcf/d to 1,253,000 MMcf/d. In fact, the large increase was actually 608,605 Dth/d to 1,253,000 Dth/d. NGI regrets the error.