Less than two months after Goodrich Petroleum Corp. said it encountered a problem during hydraulic fracturing (fracking) operations at a well in the Tuscaloosa Marine Shale (TMS) in Mississippi, the company on Thursday reported that the well reached a peak rate from a shortened lateral of 530 Boe/d, composed of 501 bbl of oil and 174 Mcf of gas.
Plugs
Articles from Plugs