Florida Gas Transmission advised shippers that it has received gas “at certain receipt points” in Zones 1, 2 and 3 containing high concentrations of hexane and heavier components that may interfere with operation of pipeline facilities. If the composition of the gas containing the objectionable components does not change, FGT said it may be required to limit such receipts. “If necessary, FGT will advise of the specific locations where these limits may be imposed,” a bulletin board posting said Wednesday.

El Paso completed repairs to the Navajo Station’s 1C oil cooling water fan gearbox Tuesday afternoon and ended a related capacity reduction of 40 MMcf/d on the North Mainline (see Daily GPI, Dec. 18).

©Copyright 2002 Intelligence Press Inc. All rights reserved. The preceding news report may not be republished or redistributed, in whole or in part, in any form, without prior written consent of Intelligence Press, Inc.