April 26-30 turbine modification at Transwestern’s BloomfieldStation on the San Juan Lateral will cut 25,000 MMBtu/d of Ignacio(CO) to Blanco (NM) capacity.

As required by Louisiana’s Calcasieu Parish Drainage District,Sabine Pipe Line must lower part of its 22-inch mainline. The workwill cut capacity at Florida Gas Transmission’s Sabine-Kaplaninterconnect to zero today through Sunday.

©Copyright 1999 Intelligence Press Inc. All rights reserved. Thepreceding news report may not be republished or redistributed, inwhole or in part, in any form, without prior written consent ofIntelligence Press, Inc.