Dominion has rescinded an OFO prompted by full storage pools and overdeliveries into its system (see Daily GPI, Dec. 7). However, a Nov. 8 “Equalization Advisory,” in which shippers were asked to be sure that receipt and delivery volumes conformed with each other, remains in effect, Dominion said.

Physical injections and withdrawals will not be available today and Thursday at the Bistineau Storage Facility in North Louisiana as operator Gulf South performs maintenance. Nominations utilizing Bistineau meters during this period will be confirmed and scheduled to the extent that Gulf South can use other facilities to balance the system.

El Paso said it will extend Line 1200 repairs between the Williams and Seligman stations through Jan. 6. North Mainline capacity was increased recently because of cooler ambient temperatures at the compressor stations, the pipeline said, but the continuing outage on Line 1200 is withholding 50 MMcf/d from the North Mainline’s normal winter capacity.

©Copyright 2001 Intelligence Press Inc. All rights reserved. The preceding news report may not be republished or redistributed, in whole or in part, in any form, without prior written consent of Intelligence Press, Inc.