Citing significant demand in its market area, Florida GasTransmission issued an Overage Alert Day notice Thursday, effectiveuntil further notice. The OFO has a 10% tolerance for negativedaily imbalances.

Northern Natural Gas did not extend a System Overrun Limitationnotice (see Daily GPI, Nov. 16) beyondThursday.

El Paso announced changes to its pipeline cleaning and internalinspection program. Line 1100 between Eunice and Pecos RiverStations will be smart pigged Sunday (postponed one day), causing a200 MMcf/d flow reduction through Eunice to the South Mainline. Sixinterconnects will not be able to deliver into El Paso for 10 hoursthat day. Another smart pigging of Line 1100 between Pecos Riverand Guadalupe Stations will occur Nov. 22 (also postponed one day),requiring a reduction of 200 MMcf/d through Pecos River. Line 1203(Maricopa Line) pigging will be done Nov. 21-24, reducing theline’s capacity by 60 MMcf/d and affecting deliveries of San Juangas to the Phoenix area. Line 3222 pigging will be done Nov. 30 andDec. 19, causing a 100 MMcf/d allocation. Line 3201 pigging will bedone Dec. 2 and 20, causing a 150 MMcf/d allocation. Theallocations will affect points upstream of Bondad Mainline andGallup.

©Copyright 2000 Intelligence Press Inc. All rights reserved. Thepreceding news report may not be republished or redistributed, inwhole or in part, in any form, without prior written consent ofIntelligence Press, Inc.