El Paso canceled an Unauthorized Overpull Penalty alert Thursdayafter it had been in effect for two days.(see Daily GPI, Aug. 16).

Florida Gas Transmission extended an Overage Alert Day (see DailyGPI, Aug. 17) through Thursday untilfurther notice, but tightened the tolerance for negative dailyimbalances from 15% to 8%.

Koch Gateway will relocate today to new facilities at 20Greenway Plaza in Houston. Due to the move, the pipeline will beoperating with on-call personnel from noon today until Mondaymorning. See the bulletin board for a list of on-call phonenumbers.

PG&E Gas Transmission-Northwest wants to buy up up to200,000 dekatherms for linepack between Aug. 28 and Sept. 15. It isaccepting bids through 2 p.m. PDT Aug. 25. Deliveries may be madeat either Kingsgate or Stanfield. Daily volumes are negotiable, butat least 50,000 dekatherms must be delivered by the end of theSept. 4 gas day. Call Doug Hahn at (503) 833-4201 or -4200 for moreinformation.

Transwestern has two capacity-cutting projects tentativelyscheduled for Sept. 6-10. Maintenance at the Gallup (NM) CompressorStation will reduce San Juan Lateral capacity from 850,000 MMBtu/dto 580,000 MMBtu/d. The work will be done in conjunction with smartpigging of the Section 5 main line and loop line between Station 5(Thoreau, NM) and Station 4 (Klagetoh, AZ), which will cut West ofThoreau capacity from 1.09 Bcf/d to 800,000 MMBtu/d.

©Copyright 2000 Intelligence Press Inc. All rights reserved. Thepreceding news report may not be republished or redistributed, inwhole or in part, in any form, without prior written consent ofIntelligence Press, Inc.