NGI Archives | NGI All News Access
Transportation Notes
Tennessee lifted a pro rata seal through Secondary Services atthe Transco Rivervale meter Wednesday but replaced it with asimilar one at the Algonquin Mendon meter.
Koch Gateway began maintenance Monday on Index 291, a segmentnear New Orleans, that will run through June 2. Flow to Entergy’sNine-Mile generating plant is limited to 170 MMcf/d during thisperiod.
Effective Friday, two El Paso delivery points in El Paso County,TX, will no longer be available for scheduling. Scheduling for DSUG311 Angel Park (DRN Code 18183) and DDEL ELP Del Norte No. 1 (DRNCode 151588) will be moved to Scheduling Location DSUG ELP (DRNCode 216777), and Contract Location 20616 01 will be moved to theClint Interconnect (DRN Code 278512). The revision is related to ElPaso’s receipt of authorization to abandon by sale certainfacilities in El Paso County to Southern Union Gas.
©Copyright 2000 Intelligence Press Inc. All rights reserved. Thepreceding news report may not be republished or redistributed, inwhole or in part, in any form, without prior written consent ofIntelligence Press, Inc.
© 2024 Natural Gas Intelligence. All rights reserved.
ISSN © 1532-1231 | ISSN © 2577-9877 |