Algonquin Gas Transmission said its interconnect with Tennessee Gas Pipeline at Mahwah (Meter station 00201) was restricted and sealed to capacity on Friday. No increases in receipts to Mahwah were accepted.

Due to a possible leak, ANR said it will be performing unplanned pipeline maintenance at EI 307 (DRN#29473), located in the Southeast Area Fuel Segment (SE-4). Effective Friday, EI 307 was shut-in until further notice.

Gulf South Pipeline said it will be performing pigging maintenance on Index 205 (Iowa Franklin 10″) from MP 95.70 (Crowley, LA) to MP 118.55 (Lafayette, LA) beginning May 14 and continuing for approximately seven days. Gulf South field personnel will be in contact and coordinating with the affected CenterPoint farm taps.

Gulf South Pipeline said it will be performing compressor maintenance on the Destin compressor station beginning at 7 a.m. Tuesday, May 11, and continuing for approximately 10 hours. The pipe said based on current system operations and nominations, it does not anticipate any impact to shippers utilizing LOC 22128 CLARKE COUNTY (to Destin).

TransCanada announced a non-renewed existing capacity open season on the Canadian Mainline for service starting Nov. 1. The solicitation opened Friday and will close at 8 a.m. Calgary time on May 14. TransCanada said it will be accepting bids for non-renewed existing capacity as a result of April 30 contract renewals for firm transportation service.

NOVA Gas Transmission has completed its review of the findings from the winter maintenance program and has requested regulatory approval to return the NPS 20 Peace River Mainline within segment 1 (UPRM) to normal operating pressures. A decision is anticipated sometime towards the end of May. Until regulatory approval has been received, the current 100% IT-R flow restrictions in segment 1 (UPRM) will remain in place.

El Paso said the Window Rock maintenance pipe replacement project originally scheduled through May 7 has been extended through May 14. No gas can be scheduled at ITWWINRK during this outage.

The Sable Offshore Energy Project is still undergoing a planned outage, which is scheduled to end for gas day Tuesday.

©Copyright 2010Intelligence Press Inc. All rights reserved. The preceding news reportmay not be republished or redistributed, in whole or in part, in anyform, without prior written consent of Intelligence Press, Inc.