Due to engine maintenance at several compressor stations along its Southeast Mainline (SEML), ANR anticipates the following SEML capacity reductions (from a 1,399 MMcf/d base): 285 MMcf/d Dec. 2-7, 105 MMcf/d Dec. 8-18 and 70 MMcf/d Dec. 19-31. “Based on current nominations, it is anticipated that the above reductions may result in the curtailment of Firm Secondary and IT services,” ANR said.

Florida Gas Transmission is not accepting delivery of gas from Northern Natural Gas (NNG)-operated Matagorda Offshore Pipeline System at its Refugio, TX, interconnect due to high moisture content, NNG said Thursday. NNG said it is assessing the alternatives available to return the point to service, adding that the Refugio delivery point with Houston Pipe Line is not affected by the high-moisture gas and continues to be available for nominations.

Gulf South said Thursday it had completed planned compressor maintenance on Unit #3 at its Hall Summit Compressor Station and capacity there was fully restored.

©Copyright 2009Intelligence Press Inc. All rights reserved. The preceding news reportmay not be republished or redistributed, in whole or in part, in anyform, without prior written consent of Intelligence Press, Inc.