Florida Gas Transmission plans a smart pig run April 5-9 betweenStations 2 (Robstown, TX) and 3 (Port Lavaca, TX). The project willlimit capacity at these interconnects upstream of Station 3:Duke-Robstown (40 MMcf/d), Valero Nueces (35 MMcf/d) and MOPS (75MMcf/d).

©Copyright 1999 Intelligence Press Inc. All rights reserved. Thepreceding news report may not be republished or redistributed, inwhole or in part, in any form, without prior written consent ofIntelligence Press, Inc.