ANR notified interruptible storage customers under the DDS andMBS rate schedules that they will be limited to zero net injectionsduring the Sept. 1-Oct. 31 period. Injections will be allowed intoDDS/MBS accounts only if the customer withdraws an equal or greateramount of gas prior to Nov. 1.
Zero
Articles from Zero
Transportation Notes
Flows will be scheduled to zero through the constrained area asNGPL performs a class upgrade Aug. 3-5 on its A/G Line near Station802 (Lamar County, TX). A similar restriction will occur Aug. 3-4as NGPL lowers the Arkoma Line near Station 812 (Atoka County, OK).See the bulletin board for details on the constraint locations.
Yale Economist Trashes Auctions; Would Disband FERC
There is zero probability the Federal Energy RegulatoryCommission can design a pipeline capacity auction that wouldefficiently operate in the marketplace, according to an eminenteconomist who suggested the best strategy would be to get rid ofFERC.
Yale Economist Would Disband FERC
There is zero probability the Federal Energy RegulatoryCommission can design a pipeline capacity auction that wouldefficiently operate in the marketplace, according to an eminenteconomist who suggested the best strategy would be to get rid ofFERC.
Transportation Note
Transwestern said its La Plata compressor station will be downthrough Thursday, March 5, for construction. There will be zerovolumes flowing from the Ignacio area to the Blanco Hub.Interconnects affected are NWPL-La Plata, WFS Ignacio Plant, andAmoco Florida River Plant. Capacity from the Blanco Hub to Thoreauwill remain at 800,000 MMcf/d. The same scenario also will applyMarch 28 through 31, Transwestern said.