Texas Eastern Transmission LP (Tetco) told FERC that the second phase of a project designed to transport natural gas from the Marcellus and Utica shales to existing interconnects in Michigan has entered service.
Teal
Articles from Teal
Nexus Natural Gas Pipeline 80% Completed, Says DTE
Construction of Nexus Gas Transmission LLC’s 1.5 million Dth/d Appalachian takeaway pipeline is 80% complete, with mainline welding 100% complete, according to the company.
July 30, 2018