Tag / Ruby

Subscribe

Ruby

Industry Briefs

A public comment period is open through Aug. 10 on the draft environmental impact statement (EIS) for El Paso Corp.’s Ruby Pipeline Project, which would carry up to 1.5 million Dth/d of natural gas about 675 miles from Wyoming to Oregon. The draft EIS was issued in June by Federal Energy Regulatory Commission (FERC) staff (see NGI, June 22) to satisfy the requirements of the National Environmental Policy Act of 1969. It evaluates, analyzes and discloses the direct, indirect and cumulative environmental impacts of the proposed pipeline. Comments may be submitted electronically at www.ferc.gov or efiling@ferc.gov. Comments by mail, which should include an original and two copies, should be sent to Kimberly D. Bose, secretary, FERC, 888 First St. NE, Room 1A, Washington, DC 20426. Reference Docket No. CP09-54-000 and label one copy to the attention of the Gas Branch 1, PJ-11.1. Public meetings to discuss the project also are scheduled this month in each of the affected states, which also include Utah and Nevada. For more information contact National Project Manager Mark Mackiewicz at (435) 636-3616, or 125 South 600 West, Price, UT 84501.

July 13, 2009

Comment Period Opens for Ruby Pipeline Draft EIS

A public comment period is open through Aug. 10 on the draft environmental impact statement (EIS) for El Paso Corp.’s Ruby Pipeline Project, which would carry up to 1.5 million Dth/d of natural gas about 675 miles from Wyoming to Oregon.

July 9, 2009
1 2 Next ›