Reactivated

Industry Briefs

NuStar Logistics has reactivated and plans to operate its 60-mile Pettus South Pipeline to transport Eagle Ford crude oil to Corpus Christi, TX, part of its agreement with Koch Pipeline Co. LP, a subsidiary of Koch Industries Inc. The move will add 30,000 b/d of capacity to the Koch system, which totals about 540 miles in South Texas. In May 2010 Koch completed projects to expand its crude oil and gas condensates capacity by 25,000 b/d, then added another 50,000 b/d of crude and condensate capacity through an agreement with Arrowhead Pipeline LP in September 2010.

August 1, 2011

Industry Briefs

Energas Resources Inc. has reactivated oil and natural gas production in the Parkway Project in Kentucky after gas testing met pipeline requirements. The company’s field personnel have converted two of the first four wells to electric pump jacks utilizing a timing system to stabilize flow rates and pressure. The two wells have produced approximately 66 MMBtu/d of natural gas and 2 b/d of oil since May 23. Energas is now reevaluating the development strategy and proposed treatment methods for the Parkway Project.

July 3, 2007