Permian Global Access Pipeline LLC (PGAP), a 625-mile, 42-inch diameter pipeline project designed to feed supply to Tellurian Inc.’s proposed Driftwood liquefied natural gas (LNG) terminal in Louisiana, has asked to open the pre-filing process at FERC.
Pgap
Articles from Pgap

Tellurian Launches Permian-to-Louisiana Natural Gas Pipe Binding Open Season
Tellurian Inc. has launched a binding open season for a natural gas pipeline that would carry at least 2 Bcf/d from the Permian Basin to the Louisiana coast.
April 8, 2019