An Unauthorized Overpull Penalty situation declared Tuesday afternoon by El Paso remained in effect Wednesday until further notice.
Penalty
Articles from Penalty
Transportation Notes
Saying linepack had stabilized, El Paso canceled an Unauthorized Overpull Penalty alert late Wednesday afternoon. The OFO had been initiated Monday.
Transportation Notes
Citing low linepack, El Paso declared an Unauthorized Overpull Penalty situation that took effect Monday until further notice. The restricted operation at Guadalupe Station (see below) will limit or eliminate withdrawals from Washington Ranch Storage Field today, El Paso said.
Transportation Notes
El Paso declared an Unauthorized Overpull Penalty situation Saturday. It was still in effect Monday until further notice.
Transportation Notes
Saying linepack had stabilized, El Paso canceled an Unauthorized Overpull Penalty alert late Tuesday afternoon.
Transportation Notes
El Paso declared an Unauthorized Overpull Penalty situation Sunday and kept it in place through Monday.
Transportation Notes
Saying linepack had stabilized, El Paso canceled an Unauthorized Overpull Penalty alert Wednesday, one day after it had gone into effect. The pipeline also said it will take Line 1100 between the Eunice and Pecos River stations down for repairs June 26. Six interconnects will be unable to deliver into El Paso that day, and the total flow of gas through Eunice Station to the South Mainline will be limited to 245 MMcf/d. Plants upstream of Eunice and in the Monument area will compete for space with San Juan and Anadarko gas moving south from Plains Station.
Transportation Notes
Reporting that its Washington Ranch Storage Field was experiencing maximum withdrawals, El Paso declared an Unauthorized Overpull Penalty situation Tuesday. It urged shippers to review their supply/demand balances and the performance of their suppliers to insure that sufficient gas is delivered to El Paso to cover the gas being taken off-system. The pipeline said it will limit scheduled volumes at underperforming interconnects.
Transportation Notes
Reporting that its Washington Ranch Storage Field was experiencing maximum withdrawals, El Paso declared an Unauthorized Overpull Penalty situation Tuesday. It urged shippers to review their supply/demand balances and the performance of their suppliers to ensure that sufficient gas is delivered to El Paso to cover the gas being taken off-system. The pipeline said it will limit scheduled volumes at underperforming interconnects.
Transportation Notes
El Paso extended through at least Thursday an UnauthorizedOverpull Penalty alert it had declared Wednesday afternoon due tolow linepack. Overpulls on the South Mainline prompted El Paso topostpone the annual maintenance shutdown of its Keystone MainlineStation (Winkler County, TX), which had previously been scheduledto start today in conjunction with smart pigging of the downstreamLine 1103, until Saturday. The work will last through Monday andcause the shut-in of 400 MMcf/d at 37 receipt points in thevicinity.