Emergency

Transportation Note

Capacity on Transwestern’s San Juan Lateral between Ignacio, COand Blanco, NM will be limited to about 525 MMcf/d during a one-dayemergency shutdown test and maintenance outage May 11 at BloomfieldCompressor Station. Normal capacity of about 800 MMcf/d will resumeMay 12. Transwestern suggested the Blanco and Window Rock points onEl Paso to shippers as alternate options for gas flow out of SanJuan during the Bloomfield outage.

May 6, 1999

Transportation Notes

El Paso’s Caprock (NM) Station is down for emergency maintenancethat began Tuesday and will last at least through March 31. Afterthat point one of the two compressor units should be available, thepipeline said. San Juan Crossover capacity is being limited toabout 550 MMcf/d. El Paso encouraged shippers to use theTranswestern interconnect at Window Rock (AZ) to maximize flowsfrom San Juan Basin.

March 26, 1999

Transportation Notes

El Paso’s Waha GE will be down for emergency maintenance at 6p.m. today through Thursday, March 25, for field gas compressorbearing replacement.

March 22, 1999

TRC Seeks Legislative Relief for Producer

Seeking emergency relief for Texas oil and gas producerssuffering from low commodity prices, the three-member TexasRailroad Commission (TRC) last week voted to propose statelegislation to suspend severance tax payments when the price foroil and gas drops below $15/barrel of oil or $1.50/Mcf of naturalgas as determined by the Comptroller of Public Accounts

January 19, 1999

TRC Seeks Legislative Relief for Producers

Seeking emergency relief for Texas oil and gas producerssuffering from low commodity prices, the three-member TexasRailroad Commission (TRC) last week voted to propose statelegislation to suspend severance tax payments when the price foroil and gas drops below $15/barrel of oil or $1.50/Mcf of naturalgas as determined by the Comptroller of Public Accounts.

January 18, 1999
1 7 8 9 Next ›