Pacific Gas and Electric did not extend a high-inventory OFO beyond Wednesday.
Caprock
Articles from Caprock
Transportation Notes
El Paso has the Laguna #2 compressor down for maintenancethrough Saturday and will be working on the Caprock #2 turbineSaturday through May 3. The two projects reduce San Juan Crossovercapacity by 30 MMcf/d.
Transportation Notes
El Paso estimates one of the two compressor units at its Caprock(NM) Station will return to service by April 16, raising San JuanCrossover capacity to 600 MMcf/d from its current 580 MMcf/d. Itappears the other unit will remain unavailable until mid-May, thepipeline said.
Transportation Notes
El Paso’s Caprock (NM) Station is down for emergency maintenancethat began Tuesday and will last at least through March 31. Afterthat point one of the two compressor units should be available, thepipeline said. San Juan Crossover capacity is being limited toabout 550 MMcf/d. El Paso encouraged shippers to use theTranswestern interconnect at Window Rock (AZ) to maximize flowsfrom San Juan Basin.