Saying maintenance on Belen (NM) Station’s #1 turbine had been completed ahead of schedule, El Paso increased capacity of the San Juan Crossover to 650 MMcf/d Friday.
Belen
Articles from Belen
Transportation Notes
El Paso extended Lincoln Station compressor maintenance and water leak repairs on Belen Station’s Unit #1. San Juan Crossover capacity will continue to be reduced by 100 MMcf/d through Monday. The pipeline also said internal inspection pigging scheduled Friday (July 19) on Line 1208 will require a larger flow cut than previously announced. North Mainline capacity will be reduced by 160 MMcf/d.
Transportation Notes
El Paso extended Lincoln Station compressor maintenance and water leak repairs on Belen Station’s Unit #1. San Juan Crossover capacity will continue to be reduced by 100 MMcf/d through Monday. The pipeline also said internal inspection pigging scheduled Friday (July 19) on Line 1208 will require a larger flow cut than previously announced. North Mainline capacity will be reduced by 160 MMcf/d.