In the article “Bison Pipeline is Back and Eyeing Growth” (see Daily GPI, Oct. 17), NGI misquoted Todd Johnson, TransCanada’s marketing director for U.S. Pipelines West, in his remarks regarding the company’s restart of the Bison natural gas pipeline following a rupture in July. For the record, TransCanada provided the following statement: “TransCanada worked closely with the Pipeline Hazardous Materials and Safety Administration (PHMSA) in the aftermath of the incident to identify what actions would need to be taken in order to safely return the pipeline to service at its approved maximum allowable operating pressure. Among other things, TransCanada conducted an inline inspection of the entire length of the pipe and provided the data and analysis to PHMSA. PHMSA worked diligently with the TransCanada team and the information provided and concluded that as of noon Saturday, October 8, Bison could safely lift its force majeure condition and return to full service at its original maximum allowable operating pressure.” NGI regrets the error.

©Copyright 2011Intelligence Press Inc. All rights reserved. The preceding news reportmay not be republished or redistributed, in whole or in part, in anyform, without prior written consent of Intelligence Press, Inc.