Regulatory

FERC Issues Draft EIS for Tellurian’s Driftwood LNG

FERC has issued a draft environmental impact statement (DEIS) for the Driftwood LNG project, which calls for construction and operation of a 26 million metric ton/year liquefied natural gas export facility near Lake Charles, LA, and a 96-mile pipeline connecting the facility to interstate pipelines. Read More

Pennsylvania Regulators Urged to Deny Air Permit Exemptions for Shell Pipeline

Seven organizations have filed a joint protest with the Pennsylvania Department of Environmental Protection strongly urging the agency to deny air permit exemptions that Shell Pipeline Co. LP has requested for its Falcon Ethane Pipeline System, which is being developed to feed the multi-billion dollar cracker under construction in the state. Read More

Valley Crossing Again Calls for Delaying Tex-Mex Natural Gas Pipeline Project

For the second time this year, Valley Crossing Pipeline has informed FERC that conditions will force it to delay work on its Border Crossing Project, a 1,000-foot stretch of 42-inch diameter pipeline that would extend from a point in Texas state waters about 30 miles east of Brownsville, to the international border with the Mexican state of Tamaulipas. Read More