Daily GPI / NGI All News Access

Transportation Notes

Florida Gas Transmission ended Friday an Overage Alert after a two-day run.

During routine offshore pigging on Transco's Central Louisiana Lateral, the volume of associated liquids received was in excess of current liquid handling capabilities of onshore facilities, the pipeline said. As a result, flows from the Vermilion 16, 22 and 39 receipt points, with an aggregate volume of about 7 MMcf/d, became unavailable Friday. Transco said it expected normal operations to resume late Monday afternoon.

TGT plans scheduled maintenance lasting seven to 14 days starting May 24 on a segment of its eight-inch diameter Bay Round pipeline. The Chevron-Block 8 and Old Camp Pass locations will be shut in during this period.

©Copyright 2011 Intelligence Press Inc. All rights reserved. The preceding news report may not be republished or redistributed, in whole or in part, in any form, without prior written consent of Intelligence Press, Inc.

ISSN © 2577-9877 | ISSN © 1532-1231
Comments powered by Disqus