Pacific Gas and Electric extended a Stage 2 high-inventory OFO on its California Gas Transmission system through at least Thursday, but slightly loosened the tolerance for daily positive imbalances from 5% to 6%.

Gulf South said it has rescheduled two days of pipe maintenance on Index 387 (its Hattiesburg 8-inch diameter line in Simpson and Covington counties, MS) to begin Aug. 17. The work, which will require no service at various CenterPoint and Willmut residential farm taps and a one-day shut-in of the Trimble Field CP location, previously had been set to start next Tuesday.

During pressure uprate work that began Tuesday, some portion of the ML 68 segment will be out of service between the Greasewood and Fidlar compressor stations, Questar said. “Gas coming on east of Greasewood must go off east of Greasewood,” it added. As a result, Questar has adjusted Rifle capacity based on nominations off this part of the system, based on Tuesday nominations, to about 70,000 Dth/d. “As a reminder, the available delivery points east of Greasewood are White River Hub Maps 410 [and] 408, Rifle Cogen MAP 160 and Rocky Mountain Del. MAP 264,” the pipeline said.

©Copyright 2010Intelligence Press Inc. All rights reserved. The preceding news reportmay not be republished or redistributed, in whole or in part, in anyform, without prior written consent of Intelligence Press, Inc.