El Paso Natural Gas issued an emergency notice Monday, reportingthat the Bondad 2A turbine must be taken down to repair an oil leaktoday. The work will reduce the capacity of the station by 95MMcf/d. El Paso also said Line 1200 and 1201 are being “SmartPigged” this week on Sept. 19, 21 and 24, causing a reduction of 40MMcf/d of San Juan Basin capacity. If you have questions, callMario Montes at (915) 496-2617.

©Copyright 2000 Intelligence Press Inc. All rights reserved. Thepreceding news report may not be republished or redistributed, inwhole or in part, in any form, without prior written consent ofIntelligence Press, Inc.