Daily GPI / NGI All News Access

Transportation Notes

Transportation Notes

About 1 Bcf/d of NOVA capacity will be cut from May 31 to June 9 as part of the system is inspected for stress corrosion cracking while tie-ins and other maintenance are performed. NOVA will take 100 miles of 36-inch line between the Miekle River and Knight compressor stations in northwest Alberta out of service during that time. NOVA normally moves a total of about 11.8 Bcf/d, a spokesman said.

Union Gas Ltd. is taking bids through 1 p.m. EDT today for up to 2 Bcf of peak storage service at its Dawn market hub in eastern Canada. The service permits summer 1999 injection and winter 1999-2000 withdrawal. The open season offer can be found on the Internet at http://www.uniongas.com/b2b/stc/pipeline/index.html under "storage services."

El Paso said work on the Gallup (NM) "C" turbine will be extended. Unforeseen repairs will keep the Gallup unit unavailable until Sunday, El Paso said, limiting San Juan Basin outlet capacity to 2,625 MMcf/d though Saturday.

©Copyright 1999 Intelligence Press Inc. All rights reserved. The preceding news report may not be republished or redistributed, in whole or in part, in any form, without prior written consent of Intelligence Press, Inc.

Copyright ©2018 Natural Gas Intelligence - All Rights Reserved.
ISSN © 2577-9877 | ISSN © 1532-1231
Comments powered by Disqus