Daily GPI / NGI All News Access

Transportation Note

Transportation Note

Capacity on Transwestern's San Juan Lateral between Ignacio, CO and Blanco, NM will be limited to about 525 MMcf/d during a one-day emergency shutdown test and maintenance outage May 11 at Bloomfield Compressor Station. Normal capacity of about 800 MMcf/d will resume May 12. Transwestern suggested the Blanco and Window Rock points on El Paso to shippers as alternate options for gas flow out of San Juan during the Bloomfield outage.

©Copyright 1999 Intelligence Press Inc. All rights reserved. The preceding news report may not be republished or redistributed, in whole or in part, in any form, without prior written consent of Intelligence Press, Inc.

ISSN © 2577-9877 | ISSN © 1532-1231
Comments powered by Disqus