Florida Gas Transmission reported completion of lowering its30-inch mainline at Station 7.5 in South Louisiana ahead ofschedule and has commenced lowering the 24-inch mainline. This workis expected to limit St. Landry volumes to 910 MMcf/d-65 MMcf/dbelow maximum-through April 10.

©Copyright 1999 Intelligence Press Inc. All rights reserved. Thepreceding news report may not be republished or redistributed, inwhole or in part, in any form, without prior written consent ofIntelligence Press, Inc.