Shale Daily | NGI All News Access | NGI Archives
Correction
In the story “Chevron Studying Potential for Carbon Capture Project in California,” the expected completion date of the pre-front end engineering design study was misstated. It is scheduled for the end of June. NGI’s Shale Daily regrets the error.
© 2024 Natural Gas Intelligence. All rights reserved.
ISSN © 2577-9877 | ISSN © 2158-8023 |