A June 2 Brief included outdated information about Texas Gas Transmission LLC’s Southern Indiana Lateral Project (see Daily GPI, June 2). The project includes 30.6 miles of 10-inch diameter pipeline lateral with a capacity of 53,500 MMBtu/d. The pipeline extends from an interconnection with Texas Gas’ existing Robards Junction facilities in Henderson County, KY, to an interconnection with SABIC Innovative Plastics Mt. Vernon in Posey County, IN. NGI regrets the error.